Builders of this multi-level block of six homes used SPEEDFLOOR® to fast-track installation and reduce time onsite. The floor joist cassettes were manufactured and assembled offsite while the walls below were being finished. The team then hoisted the steel joists into place and were able to start work on the electrics and plumbing immediately, thanks to the pre-punched service holes.